Home
Product Directory
Manufacturing & Processing Machinery
Building Material Making Machinery
Tile Making Machine
Metal Tile Making Machine
Single Sink Zinc Sheet Metal Roof Tile Roll Forming Making Machine
US$10,000.00 | 1 set (MOQ) |
Port:
Tianjin, China
Production Capacity:
0-25m/Min
Payment Terms:
L/C, T/T, D/P, Western Union, Paypal, Money Gram
Botou Xinghe Roll Forming Machinery Co., Ltd.
Hebei, China
Last Login Date:
Jul 15, 2025
Business Type:
Manufacturer/Factory
Find Similar Products
Product Description
Company Info
Basic Info.
Model NO.
Sink machine
Tile Type
Glazed Steel
Certification
CE, ISO
Condition
New
Customized
Customized
Usage
Roof, Wall, Floor
Transmission Method
Electric
Hydraulic Motor
5.5kw
Shafts Diameter
80mm
Control Type
PLC Control System
Material Thickness
1.0-3.0mm
Stations
18 Steps
Trademark
XINGHE
Transport Package
Naked and Covered by Plastic Film Into Container
Specification
6300mm*1200mm*1200mm(L*W*H)
Origin
Hebei Cangzhou
HS Code
8455221000
Product Description
Single Sink Zinc Sheet Metal Roof Tile Roll Forming Making Machine
Feeding and Leveling Device
Hydraulic Pre-Cutting
Punching and Cutting tool material:mold steel Cr12MoV,Heat treatment
Main Machine
Body frame made from H300 type steel by welding
Side wall thickness: Q235 t30mm
Rollers manufactured from GCr15/Cr12 steel,CNC lathes,Heat Treatment
Shafts Diameter=ф90,precision machined
Gear/Sprocket driving,about 21-step to form
Main Motor=18.5KW , Frequency speed control
Speed redcucer motor:K series
Size changing motor:6pcs(Auto change the width ,height and lip),Automatically controlled by PLC ProgramingAfter-Sale Service:
1. The warranty is 24 months after the client receives the machine.
Within The 24months, we will courier the replacement parts to the client free of charge
2.We offer technical support for the entire life of our machines
3. We can send our technicians to install and train the workers in the clients' factories with extra cost
Terms Of Trade:
Packing Style:
Company Information
FAQ:
Q1. What are the main key points for selecting right machines?
A1: Whole structure,Roller Shaft,Roller Material,Motor&Pump,and Control system. As the new buyer, please kindly know that price
not the final point.
Good quality is for long-term business cooperation.
Q2. Can you provide OEM service for roll forming machine?
A2: Yes, most of cold roll forming machine need to be customized as detailed request, because raw material , size , production
usage, machine speed, then machine specification will be some different.
Q3. What's your standard trade terms ?
A2: We can provide the technical offer with FOB,CFR,CIF,Door to Door and so on. Please kindly tell the detailed port name for
competitive ocean freight.
Q4. How about the quality control?
A4: Our company adopts 6S system to control every part with passed ISO9001:2000, CE,TUV/BV(******) Certificate.
Q5. How about the after-sale service?
A5: We provide 18 months free warranty and free technical support for the whole life of any machine. During warranty period, if
parts still broken, we can send the new ones freely.
Q6. If I am in Beijing,Shanghai or Guangzhou,how to visit your company?
A6: 1) Beiing South Statioin to Cangzhou West Station (by fast train 1 hour).
2) Shanghai Hongqiao to Cangzhou West (4.5 hours)
3) Guangzhou Airport to Tianjin ,then Tianjin to Cangzhou West
Feeding and Leveling Device
Hydraulic Pre-Cutting
Punching and Cutting tool material:mold steel Cr12MoV,Heat treatment
Main Machine
Body frame made from H300 type steel by welding
Side wall thickness: Q235 t30mm
Rollers manufactured from GCr15/Cr12 steel,CNC lathes,Heat Treatment
Shafts Diameter=ф90,precision machined
Gear/Sprocket driving,about 21-step to form
Main Motor=18.5KW , Frequency speed control
Speed redcucer motor:K series
Size changing motor:6pcs(Auto change the width ,height and lip),Automatically controlled by PLC ProgramingAfter-Sale Service:
1. The warranty is 24 months after the client receives the machine.
Within The 24months, we will courier the replacement parts to the client free of charge
2.We offer technical support for the entire life of our machines
3. We can send our technicians to install and train the workers in the clients' factories with extra cost
Terms Of Trade:
Minimum order quantity (MOQ) | 1 Set |
Delivery time | about 45 workdays |
Port of loading | port of TIANJIN |
Type of payment | by T/T or by L/C |
Export | to more than 80 countries and regions, including South Korea, Taiwan, UK,Greece, Australia, USA, Mexico, Brazil, Russia, UAE, Iran , India, Malaysia, Thailand, Philippines, South Africa, Nigeria, Egypt, etc |
Packing Style:
Packing method | Main body of machine is naked and covered by plastic film(to protect of dust and corrosion), loaded into container and steadily fixed in container suitable by steel rope and lock, suitable for long-distance transportation. |
Company Information
FAQ:
Q1. What are the main key points for selecting right machines?
A1: Whole structure,Roller Shaft,Roller Material,Motor&Pump,and Control system. As the new buyer, please kindly know that price
not the final point.
Good quality is for long-term business cooperation.
Q2. Can you provide OEM service for roll forming machine?
A2: Yes, most of cold roll forming machine need to be customized as detailed request, because raw material , size , production
usage, machine speed, then machine specification will be some different.
Q3. What's your standard trade terms ?
A2: We can provide the technical offer with FOB,CFR,CIF,Door to Door and so on. Please kindly tell the detailed port name for
competitive ocean freight.
Q4. How about the quality control?
A4: Our company adopts 6S system to control every part with passed ISO9001:2000, CE,TUV/BV(******) Certificate.
Q5. How about the after-sale service?
A5: We provide 18 months free warranty and free technical support for the whole life of any machine. During warranty period, if
parts still broken, we can send the new ones freely.
Q6. If I am in Beijing,Shanghai or Guangzhou,how to visit your company?
A6: 1) Beiing South Statioin to Cangzhou West Station (by fast train 1 hour).
2) Shanghai Hongqiao to Cangzhou West (4.5 hours)
3) Guangzhou Airport to Tianjin ,then Tianjin to Cangzhou West
Send your message to this supplier
People who liked this also liked